Lead
Scheduler, Lauren Constructors
Current
Project- Scheduling and Project Cost Control for Oil Refinery in Bountiful
Utah
March
2015 -Present
Scheduling
Engineer II, Kiewit, TIC Southern District
•Develop
estimate \ proposal level primavera schedules.
Oversee
development and training of College Scheduling Interns and New Hires.
•Develop
and maintain project, manpower an equipment projections based on the
current project schedules (HISTOGRAMS).
•Develop/Maintain
Detailed Construction Schedules using Primavera P6 software
•Develop
and maintain progress curves.
•Attend
and be prepared for all required project meetings.
·
Perform
routine tasks related to the collection of data required to monitor and
maintain schedules for the construction of the project.
•
Create and/or monitor project schedules.
• To
interact with management, corporate and field staff to ensure that each
project is completed on or ahead of schedule
•
Assist in developing job cost projections.
•
Implement and monitor project specific controls, scheduling and engineering
systems.
• Help
to develop and distribute weekly report packages.
·
Control
and monitor the project schedule, the 90 day schedules and the 3-week
schedules, provide updates on schedules status, prepare and submit schedule
updates as required.
·
Assist
with construction superintendents and field engineers with their
preparation of their 90 day schedules and 3-weeks schedules.
•Perform additional assignments per supervisor's direction.
•Other
duties required by management.
Projects
involved;
Charles
D Lamb Energy Center, Ponca City OK
Elk
Station Energy Center Unit1, Lubbock TX
Elk
Station Energy Center Units 2-3, Lubbock TX
Huntsman
Water Treatment Facility
Heavy
Equipment Operator, Operating Engineers
Local 3 (Northern, CA)
·
Perform
daily equipment maintenance and inspections to ensure no mechanical
failures.
·
Assist
with organization and execution of projects affiliated with.
·
Setup
work areas with survey crew and establish work plan with crew.
·
Verify
and correct blue print layout for accuracy of the work performed.
·
Proficiently
operate Bulldozer, Cat Blade, Front Loader, Backhoe, Excavator and Paving
Equipment.
Project
Controls/Scheduling Consultant, Vox
Planning inc. (Roseville, CA)
Bayonne Energy Center 2010-2011
·
8
Unit Simple Cycle, 512 megawatt, natural-gas power plant. Contract sum of
$160 Million.
·
Built
and Maintained schedule using Primavera version 6.
·
Created
weekly work schedules for Subcontractors performing work.
·
Tracked
major changes including a $10M Change Order for engineering errors.
·
Construct
Spreadsheets for Reporting and Quantity Tracking of all commodities.
·
Coordinated
with vendors for on time equipment deliveries.
·
Hosted
weekly Schedule coordination meetings with Management and all Subcontractors.
Colusa Generating Station
2008-2009
·
Combined-cycle
2-1, 660 megawatt, natural-gas power plant using GE 7FA Turbines and LEED
Gold administration building. Contract sum of $600 Million.
·
Analyzed
project schedule of 4,500 self-performed activities carried out by over 700
craftsmen.
·
Created
trend-line and target comparison charts and graphs.
·
Tracked,
verified and reviewed all field quantities, comparing reported, actual and
scheduled performance.
·
Proficiently
utilized P3 and P6 scheduling software.
|